Scope
What we clean
Every scope below has its own written procedure, its own acceptance criteria and its own quoted work window. On a construction program they are sequenced into the phases above. On an operating hall you buy them one at a time. Pick the one you are specifying.
The five-phase clean-build program. Base build and shell, rough-in and cable pull, the pre-fit-out deep clean 24 to 48 hours before rack roll-in, controlled cleaning through fit-out, then a final clean measured against the ISO 14644-1 Class 8 limits.
Read the scope →
The controls that keep construction dust out of the air and out of your air handling system while the trades are still working. Wrapped units, sealed plenum, entry hygiene, filtration, and the particle checks that verify it. Our crew can also take air quality tests through the job and hand you the series.
Read the scope →
Floor care at surface level. HEPA vacuuming of perforated tiles, edge-vac of perimeters, dust-capturing mopping with anti-static microfiber, scuff and adhesive removal, auto-scrub of slab aisles.
Read the scope →
Tile pulls and under-floor work. HEPA vacuuming of the plenum, pedestals and stringers, and tile undersides wiped with lint-free anti-static cloths. Always quoted separately.
Read the scope →
Cable tray lips, exteriors, ladder tray supports, strut, brackets and drop verticals. Worked top-down. Cleaner goes on the cloth and is never sprayed above equipment.
Read the scope →
Fixed panels, swinging and sliding doors, roof panels, strip curtains and aluminum framing. Cleaned without scratching the acrylic and without putting dust back in the air.
Read the scope →
Rack doors, side panels, tops, handles and ledges. Exterior surfaces only.
Read the scope →
Rotational programs across multiple halls. One hall at a time, cable tray down to floor, repeating for the contract term. Staffed to a fixed work window, with sign-off on every visit.
Read the scope →